Covered Bridge Resort

The Covered Bridge Resort Community is another rental community that has chosen to use ICF throughout the resort. The foundation of each cabin is built using ICF and the majority of them utilize the Mar-Flex waterproofing system. Many of the cabins consist of foundations reaching over 40 feet tall. With a stone veneer finish, the cabins retain the mountain cabin appearance but benefit from advanced construction technology. The mountain upon which the Covered Bridge Resort is housed will hold 103 cabins when complete.

12cb11

10cb12

7cb6

5cb7

8cb9

3cb3

4cb1

6cb2

9cb5

1cb10

2cb4